Get Prinected:
- Excellent process reliability as postpress is taken into
account from the outset.
- Fast job preparation thanks to central data management.
- Jobs with identical machine configuration requirements that
are grouped together for shorter changeover times.
Fast postpress settings are also crucial, saving time right up
to the end of the process.
Deadline pressure is often most acute at the postpress stage
because this is where all the jobs converge - including jobs that
have had to be modified or rescheduled and jobs that arrive late
and yet often have to be dealt with immediately. Use Prinect to
optimize postpress processes right from the job acceptance and
prepress stages by taking into account the structure of the end
product and the properties of your postpress machines for planning
and impositioning. Prinect automatically gives you access to all
the key job data on the machine and to prepress presetting data,
enabling you to quickly set up cutters, folders and saddlestitchers
step by step.
Better planning is easy
Prinect organizes your postpress operations efficiently. You
know which jobs you can process when, whether there are any delays
and what priority a particular job has. This makes Prinect
invaluable at the end of the production chain in particular. You
have an overview of all jobs, which improves capacity planning. You
can also predict bottlenecks and take remedial measures at an early
juncture. The unique overview of all planned operations makes it
possible to identify and combine jobs with similar machine
requirements. An existing machine configuration can be used for
several jobs, thereby avoiding time-consuming adjustments to the
machine configuration and speeding up production significantly.